Skip to content
RenovaOak

Price level 105.8

Massachusetts: HIC registration, supervisor license and lead rules

Two state credentials, a written-contract law with a deposit cap, and a state-run lead program: here is how they fit an interior remodel.

By RenovaOak Editorial Team Updated 8 min read

Price level
105.8 (U.S. = 100)
Contractor license
HIC registration, CSL
Contract rules
Written over $1,000
Map of the United States with Massachusetts highlighted
Massachusetts on the RenovaOak state map: highest price-level tier.

In short

At 105.8 (U.S. = 100) Massachusetts is in the highest price tier, though that index is not a remodeling price. A contractor on an owner-occupied one- to four-unit home generally needs Home Improvement Contractor (HIC) registration, and a licensed construction supervisor or design professional must oversee building work. Contracts over $1,000 must be written, with a deposit limit and a three-business-day cancel right for sales signed away from the contractor's place of business. The state, not EPA, runs the lead-safe renovation rule.

Massachusetts at a glance

Statewide price level 105 and up
Price level 105.8 (U.S. = 100) BEA regional price parity, all items, 2024
Contractor license HIC registration; supervisor license oversees Owner-occupied 1-4 units; CSL or design professional oversees building.
Contract rules Written contract over $1,000; 3-day cancel off-site Deposit capped at one-third (special orders aside); M.G.L. c. 142A.
Residential code Statewide: 780 CMR 10th ed., 2021 IRC base Effective Oct. 11, 2024; the concurrency period was extended past June 30, 2025.
Lead-safe rule State runs the RRP rule (EPA-authorized) Dept. of Labor Standards, 454 CMR 22.00.

The 105.8 price level in context

Regional price parity is BEA's way of asking what the same household basket costs in each state, housing included. Massachusetts came in at 105.8 for 2024, one of the higher readings in the country.

Housing drives much of that figure, so it does not tell you what a plumber charges to move a vanity. Before you budget, gather three written local bids and check them in the bid comparison tool. For local pay rates of carpenters, electricians and plumbers, go to data.bls.gov/oes.

Who may do the work: two credentials

The Home Improvement Contractor program covers residential contractors working on an existing, owner-occupied, non-commercial property with one to four units. The state's chart lists structural carpentry, decks, roofing, windows and siding as work that needs registration, and interior painting as work that does not. The program guide also exempts installers of wall and floor coverings.

A Construction Supervisor License (CSL) is a separate credential and the two are not interchangeable. The state says a licensed construction supervisor or a registered design professional must oversee construction of one- and two-family homes, and that on most existing one- to four-family owner-occupied homes the contractor must also be HIC-registered. Massachusetts does not recognize out-of-state contractor licenses.

  • Ask for the HIC registration number and look it up on the state lookup.
  • Ask who holds the supervisor license for the job and whose name goes on the permit.
  • Remember the Guaranty Fund pays up to $10,000 on unpaid judgments against registered contractors, and people who use unregistered contractors or pull their own permits cannot use it.

Contract and payment rules

Chapter 142A requires a written contract for residential contracting over $1,000, and the state recommends one for every job. The contractor's registration number goes on the first page, with start and finish dates, a detailed description of work and materials, the total price and a payment schedule with dates and dollar amounts. Directly above the signature line, in 10-point bold or larger: "Do not sign this contract if there are any blank spaces."

An advance payment cannot exceed one-third of the price, or the actual cost of special-order or custom materials if that is greater, and the contractor cannot demand final payment until the work is completed to the parties' satisfaction. If you sign anywhere other than the contractor's normal place of business, you may cancel until midnight of the third business day, and payments come back within ten business days. See change orders and payments for staging the money.

Permits and the building code

The 10th edition of the state building code, 780 CMR, is the current one. Its residential volume is based on the 2021 International Residential Code with Massachusetts amendments. It first took effect October 11, 2024; a concurrency period, during which the previous code could still be used, was set to end June 30, 2025; the state page says that period was later extended, and we did not find the new date. The page we read mentioned no later edition. Your local building official issues permits, and the contract must say that the contractor will obtain them. Read permits for interior remodels for what usually needs one.

Lead-safe work: the state runs it

Massachusetts is one of the states EPA has authorized to run the renovation rule itself. The Department of Labor Standards administers it as 454 CMR 22.00. Contractors doing covered work generally must be licensed as Lead-Safe Renovation Contractors, and a person with a Lead-Safe Renovator-Supervisor or Certified Renovator course certificate must be on site. Covered work is paid renovation in housing built before 1978 that goes past the minor-repair limits (more than six square feet of paint in a room indoors, or 20 square feet outdoors), plus any window replacement. The general background is in lead paint and asbestos in older homes.

Where to check and complain

The Office of Consumer Affairs and Business Regulation answers homeowner questions about HIC contractors at 617-973-8787 or 888-283-3757. For lead-safe questions call the Department of Labor Standards at 617-626-6960. For the general hiring checklist, see choosing a remodeling contractor.

Common questions

Does my Massachusetts contractor need to be registered?

For most work on an existing owner-occupied one- to four-unit home, yes: Home Improvement Contractor registration. The state's chart says interior painting does not need it, and some installers are exempt.

When must a Massachusetts remodeling contract be in writing?

For residential contracting over $1,000. The registration number must be on the first page, and no work may start before you have a signed copy.

Can I cancel a remodeling contract in Massachusetts?

If you signed somewhere other than the contractor's normal place of business, you may cancel until midnight of the third business day.

Who enforces lead-safe renovation in Massachusetts?

The state's Department of Labor Standards, under 454 CMR 22.00, because Massachusetts is an EPA-authorized state.

Sources

Checked November 19, 2026. We read the pages above. The state's contract page and the statute differ on the deposit wording (the sample form's table says "whichever is greater"); we followed the statute text. The CSL page refers to 780 CMR chapter 1 for the homeowner exemption, which we did not open, so we do not state owner-work rules. The HIC program guide did not give a dollar floor for registration. Confirm with the agency before you act. A second check on November 20, 2026 read the main official pages again; the concurrency period for the 10th edition was extended past June 30, 2025 and we did not find the new date.