How pages are researched
Each guide starts from primary sources: federal agencies such as the EPA, HUD, the IRS, OSHA and the CPSC; state licensing boards and statutes; the model codes published by the International Code Council; manufacturers’ installation instructions; and standards bodies. Where official sources do not exist, such as typical lead times or the usual order of trades on a job, the page says “typical” and treats it as a trade convention, not a rule.
Every page shows the date it was last updated and a Sources box. The box ends with a line that starts “Checked” and gives the date the sources were opened, and says what was read and what could not be. If a figure could not be confirmed, the page describes the thing without the number.
Two rules shape what you will not find here. The guides do not print dollar prices for remodeling jobs, because no official source for them exists and a number copied from a commercial table would be a guess that looks like a fact. Instead each guide explains what drives the cost and how to get bids for your own house. And commercial or review sites are used only for market information, named in the text, and linked with a no-follow attribute.
Model codes and agency pages change. Where it matters a page says “as of” a month and year. Your building department decides which code edition and amendments apply to your address.
The state price level
Each state page and the price-by-state map show a price level for the state. It comes from the Bureau of Economic Analysis (BEA) regional price parities, series “all items”, for 2024, where the United States equals 100. The 2024 figures were published in BEA release 26-10 on February 19, 2026, and the series can be read on FRED (for example, series TXRPPALL for Texas). BEA’s next release is scheduled for December 10, 2026, and the numbers here will be rechecked then.
This is a measure of the overall price level faced by households in a state, and it includes rents. It is not a remodeling price. A state can have high rents and ordinary labor or material costs, or the reverse, and the figure says nothing about what a kitchen, a bath or a floor costs where you live. Use it as a rough background on how expensive living there is. For remodeling, collect written bids from local contractors, and look at wages for carpenters, electricians and plumbers in your area at the Bureau of Labor Statistics.
States are grouped into four tiers by that number:
| Tier | Price level (U.S. = 100) |
|---|---|
| Lowest | under 92 |
| Lower | 92 to 97.9 |
| Higher | 98 to 104.9 |
| Highest | 105 and above |
The tiers are a way to color a map. They are not a ranking of contractors or of value.
The workbench tools
The five tools in the workbench do arithmetic on numbers you enter. They do not look up prices. They are tools for checking your own thinking, not for producing an answer to rely on.
- Quote check puts two to four bids side by side, works out each per square foot, adds a contingency you choose, and uses the ZIP code you enter to show your state’s rules next to the bids. It can only compare what is written on the bids. It cannot tell you whether a bid leaves out work that you will pay for later, so read the scope on each one.
- Resale math takes your own figures: what the job costs, the value you expect it to add, the years you plan to stay and the interest you pay. It does not use any cost-versus-value table from another publisher. The value added is your assumption, and the result is only as good as that assumption. Resale value and tax treatment are covered on their own planning page.
- Floor and tile order works from the area, a waste percentage you set and the coverage of a box, and gives the number of boxes. Waste depends on the layout, the pattern and the material, and the box coverage printed on your product governs. Check both with the product’s instructions and your installer.
- Paint order estimates gallons from the wall or ceiling area, the openings you subtract and the number of coats. Real coverage depends on the paint, the surface and the application method, so the label on the can overrides the estimate.
- Basement bedroom check compares the ceiling height and the egress window you describe with the requirements of the model International Residential Code, sections R305 and R310. It is not a code review. Your state and city adopt a code edition and amend it, so local code governs, and your building department is the one to ask.
What is not here
The site does not run tests on products or contractors, does not rate or rank businesses, and does not collect reviews. Worked examples with arithmetic are labeled “Worked example with made-up numbers” and are never presented as typical or as a real job.
Questions about a method
If a method looks wrong, or you think a source was misread, write through the contact page. How errors are fixed is described in the editorial policy.