Change orders
A change order is what a remodel calls a change after the contract is signed. These are the changes in rules, taxes and trade that touch a remodel, each with its date, what it means and the official source.
-
Code
ICC says the 2027 I-Codes, including the residential code, will be published later in 2026
A press release from the International Code Council dated August 24, 2026 says the 2027 International Codes add provisions that streamline approval of off-site and modular construction by incorporating ICC/MBI Standards 1200, 1205 and 1210, and that the codes will be published later this year. The release names the International Residential Code among them and does not list changes for interior remodeling. A state or city has to adopt an edition before it governs permits.
What it means: Your permit is reviewed under the edition your jurisdiction has adopted, which is an earlier one because the 2027 edition has to be adopted first.
-
State law
Florida: local governments must exempt small single-family jobs from building permits
CS/CS/HB 803 (Chapter 2026-63) took effect July 1, 2026; the Florida Senate bill history shows Governor approval on May 6, 2026. It amends section 553.79 so that a local government may not require a building permit for work valued at $7,500 on a single-family home (state summaries say "under" and "or less", so read the statute for the exact line). It excludes electrical, plumbing, structural, mechanical and gas work, and property in flood hazard areas, and it bars splitting a job to stay below the threshold. The owner or contractor must send the local agency a written request with documents showing the nature and value of the work.
What it means: A small, non-structural interior job in Florida may not need a permit, but you still file the written request, and your local building department decides.
-
Federal rule
FHA Limited 203(k) allows four draw requests per contractor, up from two
HUD Mortgagee Letter 2026-06, dated June 23, 2026 and effective immediately, raises the cap on draw requests under the Limited 203(k) program from two to four per contractor, or per borrower acting as contractor. Each draw may include up to two separate disbursements. Work that needs more than four draws per contractor is now treated as major repair and is ineligible for the Limited program. The Standard 203(k) cap stays at five draw requests (four intermediate and one final), and the letter clarifies that a draw may include multiple disbursements.
What it means: If you use a renovation mortgage, ask the lender how many draws each contractor gets, and match your payment stages to what the lender will release.
-
Safety
OSHA and NIOSH update the hazard alert on silica dust from stone countertops
The updated OSHA/NIOSH hazard alert (NIOSH Publication 2026-101) covers respirable crystalline silica dust for workers who make, finish and install natural and engineered stone countertops, and gives guidance for keeping exposure below OSHA's permissible exposure limit. OSHA's construction standard for silica is 29 CFR 1926.1153.
What it means: Ask a countertop fabricator or installer where stone is cut and how dust is controlled, since cutting inside your home puts dust where you live.
-
Trade
Supreme Court holds that IEEPA does not authorize tariffs
In Learning Resources, Inc. v. Trump, decided February 20, 2026, the Supreme Court held that the International Emergency Economic Powers Act does not authorize the President to impose tariffs. The ruling concerns that statute; the duties on lumber, kitchen cabinets and vanities in the entries on this page are issued under Section 232, a different law.
What it means: Which duties apply to an imported tile, fixture or cabinet depends on the law used to impose them, so ask suppliers what a quoted price assumes and whether it can change before delivery.
-
Federal rule
EPA's lower dust-lead action levels apply to lead abatement sampling after January 12, 2026
EPA's rule published November 12, 2024 renamed the dust-lead hazard standards "dust-lead reportable levels" (any reportable level) and set the dust-lead action levels, formerly clearance levels, at 5 micrograms per square foot for floors, 40 for window sills and 100 for window troughs, down from 10, 100 and 400. EPA says the new levels apply to post-abatement dust-lead sampling and analysis conducted after the compliance date of January 12, 2026.
What it means: This governs lead abatement and clearance testing by certified lead professionals, so ask any firm you hire whether your job falls under that program or under the separate renovation (RRP) rule.
Source
- EPA: Hazard standards and clearance levels for lead in paint, dust and soil (TSCA sections 402 and 403)
- EPA: Will regulated entities have to perform retroactive requirements based on the November 12, 2024 final rule?
- Federal Register, November 12, 2024 (89 FR 89416): Reconsideration of the Dust-Lead Hazard Standards and Dust-Lead Post-Abatement Clearance Levels
-
State law
California: email cancellation and subcontractor disclosure for home improvement contracts
The Contractors State License Board's bulletin of December 29, 2025 lists the laws that took effect January 1, 2026. AB 1327 requires home improvement contracts to include the contractor's email address and lets buyers cancel by email; a telephone number must also be listed. SB 517 requires a contractor who uses subcontractors on a home improvement project to disclose each one's name, contact information, license number and classification on request. Separately, SB 779 raised the minimum civil penalties for violations, starting at $1,500 for unlicensed activity, from July 1, 2026.
What it means: California homeowners should look for the cancellation notice, the email address and the subcontractor details when a contract is presented.
-
Tax
Federal home energy credits 25C and 25D end after December 31, 2025
Public Law 119-21, signed July 4, 2025, ended these credits early. The IRS FAQ states that the Energy Efficient Home Improvement Credit (section 25C) is not allowed for property placed in service after December 31, 2025, and that the Residential Clean Energy Credit (section 25D) is not allowed for expenditures made after December 31, 2025. For 25D, the IRS explains that an expenditure counts as made when installation is completed.
What it means: Do not budget for either credit on work finished in 2026 or later, and ask a tax professional about work finished earlier.
-
Code
New York's 2025 Uniform Code, with the 2025 Residential Code, takes effect
The State Fire Prevention and Building Code Council adopted the 2025 Uniform Code on July 25, 2025, repealing the 2020 edition. The Department of State describes the code books as based on the 2024 ICC codes with New York changes. The effective date is December 31, 2025; building permit applications submitted from that date follow the new code, including the 2025 Residential Code of New York State.
What it means: In New York, ask your building department which code your permit application falls under; other states follow their own adoption dates, shown on each state page.
-
Trade
Planned increase in duties on cabinets and vanities delayed to January 1, 2027
Proclamation 11000, signed December 31, 2025 and published in the Federal Register on January 9, 2026, delays by one year the scheduled increases under Proclamation 10976. As amended, effective January 1, 2027 the duty on kitchen cabinets and vanities is to rise to 50 percent and the duty on upholstered wooden products to 30 percent, except for countries with which the United States reaches an agreement. The proclamation does not change the 10 percent duty on softwood timber and lumber. This entry reflects the proclamation text as read on November 19, 2026; check for later changes.
What it means: If you buy imported cabinets or vanities late in 2026 or in 2027, ask whether the quote assumes the current 25 percent rate or the scheduled 50 percent rate, and who carries the risk if the rate changes before delivery.
-
Trade
Section 232 duties start on imported lumber, kitchen cabinets and vanities
Proclamation 10976, signed September 29, 2025, set a 10 percent duty on imported softwood timber and lumber and a 25 percent duty on imported kitchen cabinets and vanities, and the same 25 percent on upholstered wooden products. The duties apply to goods entered for consumption on or after 12:01 a.m. eastern daylight time on October 14, 2025, and cover completed cabinets and vanities as well as parts.
What it means: Ask a supplier or contractor whether a cabinet or vanity quote assumes the duty, and for how many days the price is held.