Floor
Tile floors: the layers under the tile do the work
Why a tile job is a floor-structure job first, how the order is measured, and what to ask about the setting materials.
By RenovaOak Editorial Team Updated 7 min read
- What it covers
- New tile, floor prepared
- Measured by
- Square feet plus waste
- Permit
- Often none; ask the city
- Biggest unknown
- Stiffness of the floor
In short
Tile is hard and does not bend, so a tile floor fails where the floor under it moves, bounces, stays damp or was prepared badly. The layers under the tile (framing, subfloor, underlayment or backer, setting material, grout and movement joints) are most of the job. Industry guidance from the Tile Council of North America (TCNA) treats a minimum floor stiffness of L/360 as the starting point, and the maker of your setting materials sets the rest. Work out how much tile to buy with the floor and tile order calculator before you shop.
What a tile floor job includes
A tile bid should list the work in layers, not one line. Typical layers are demolition of the old floor, floor repair or leveling, underlayment or backer board, any membrane the maker calls for, setting material (thinset mortar), the tile, grout, sealer where it applies, and transitions at doorways. Wall tile, shower floors and waterproofing are separate scopes; the shower side is covered in shower and tub replacement.
Tile is set by trade convention in a usual order: prepare the floor, set tile, let the mortar cure as the maker directs, grout, then install baseboard and transitions. Treat that as typical, not a rule. Your bid and the product instructions set the order on your job.
How tile is measured and ordered
Tile is bought by the square foot of floor plus extra for cuts, breakage and the pieces you set aside. The extra depends on the layout: diagonal patterns, large tiles and small rooms with many cuts need more. Ask the installer to set the number from your layout and the tile maker's guidance.
Worked example with made-up numbers. A bathroom floor is 8 feet by 10 feet, which is 80 square feet. If the installer says to allow 12 percent waste, you order 80 × 1.12 = 89.6 square feet. If one box covers 11 square feet, 89.6 ÷ 11 is about 8.2, so you round up to 9 boxes. The 12 percent and the box size are invented to show the arithmetic; your layout and your box label supply the real figures.
The floor and tile order calculator does the same sum with your own numbers. Buy all the tile from one lot when you can, and keep a spare box, because later lots can differ in shade and size.
The floor under the tile
TCNA is the trade association that publishes the TCNA Handbook for Ceramic, Glass, and Stone Tile Installation. It describes the Handbook as a guide that its committee regularly revises, and TCNA also publishes the ANSI A108, A118 and A136.1 specifications, a compilation of voluntary installation standards (the current edition is dated July 2026). Both are written for professionals. A homeowner needs the questions they raise.
- Stiffness: TCNA's FAQ calls L/360 the accepted minimum for floor rigidity, measured before the tile underlayment goes down. For a 10-foot span that is about one third of an inch between the middle and the end. TCNA also notes that joists at 24 inches on center can meet it while the floor between joists still deflects more, and that tile can fail on floors stiffer than L/360 as well. Ask how the installer judges your floor.
- Plywood and OSB subfloors: TCNA's FAQ says the ANSI A108 standard it cites excludes oriented strand board (OSB), that tile can still be installed over OSB with backer board when the backer maker's methods are followed, and that thinset makers do not recommend setting tile directly on it. Ask which layers the bid puts over your subfloor.
- Concrete slabs: TCNA says it is not possible to state one cure time. A common suggestion is at least 28 days, and some thinset makers allow 14 days with a premium latex-modified mortar. Cracks and curling are handled before tiling, not after.
- Existing floors: TCNA's guidance on tiling over other floors points to the TCNA Handbook and says to follow the maker. Sheet vinyl has to be a single layer, clean and well attached, and not cushioned or perimeter-glued. Carpet adhesive often has to be removed completely. Asbestos-based materials need different handling, which is a reason to test before you scrape.
Dust, lead and asbestos
Demolition and cutting make dust. OSHA says respirable crystalline silica is created when cutting, sawing, grinding, drilling or crushing stone, rock, concrete, brick, block and mortar, and OSHA's construction standard sets the permissible exposure limit at 50 micrograms per cubic meter of air as an 8-hour average, with an action level of 25. For handheld power saws OSHA's Table 1 option is a saw with an integrated water system that feeds the blade, and indoors it adds a respirator with an assigned protection factor of 10. Ask your crew how it cuts, who wears what, and how dust is kept out of the rest of the house. Do not dry-cut or dry-grind a slab yourself.
Pulling up old floors can also release asbestos and lead. EPA lists vinyl floor tiles, the backing on vinyl sheet flooring and adhesives among the places asbestos may be found, and says the risk comes when the material is disturbed. If the house was built before 1978, the EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint: removing painted baseboard counts the whole piece, and work in a room that disturbs more than 6 square feet of painted surface needs a certified firm and lead-safe work practices. Lead paint and asbestos in older homes covers testing.
Permits, DIY and what to ask before you sign
Tile on a prepared floor usually does not need a permit by itself. Moving plumbing, cutting framing or adding heated floors can. The model code is usually the International Residential Code (IRC) in whichever edition your state or city adopted, and your building department decides what applies to you.
Setting a few square feet of floor tile is a job a patient do-it-yourselfer can learn. A whole floor, a floor that bounces, a slab with cracks, or any tile over old resilient flooring is a better job for a crew with references. Flat floors with large tile also need skill at lippage, the uneven edges between neighboring tiles.
Floor and layers
Subfloor repair, leveling, backer board, membranes and demolition are usually separate lines and may change after the old floor is up.
Tile and layout
Size, material, pattern and the number of cuts drive labor and waste.
Finish details
Grout type, movement joints, edge trim and transitions at doors need to be named.
- Ask what the bid puts between the joists and the tile, layer by layer, and which maker's instructions or TCNA Handbook method it follows.
- Ask how the floor's stiffness and flatness were judged, and what happens if the old floor needs work.
- Ask how and where movement joints are placed, and who pays when hidden damage shows up. See change orders.
- Ask how dust is controlled, and for pre-1978 homes who holds the lead-safe certification.
- Compare bids side by side in the bid comparison tool.
Common mistakes: tiling over a floor that flexes, setting on a young slab without asking the mortar maker, skipping movement joints, mixing tile lots, and walking on the floor before the mortar has cured. Wood and vinyl floors have different needs: see hardwood floors, vinyl plank and laminate and subfloor and moisture checks.
Common questions
Can I tile over my old floor?
Sometimes. TCNA says to follow the setting-material maker, and the old floor has to be sound, clean and stiff enough. Sheet vinyl has to be a single, well-bonded layer, and old adhesives may need testing for asbestos first.
How long should a new slab cure before tile?
TCNA says there is no single answer. A common suggestion is at least 28 days, and some mortar makers allow 14 days with a premium mortar. Ask the maker of your setting material for your product.
Why do tile floors crack?
Common causes are a floor that flexes, a slab that moves, missing movement joints and poor bonding. A crack is a symptom, so ask a pro to look at the layers under it before re-tiling.
Do I need a permit for a tile floor?
Often not for tile alone, but changes to plumbing, framing or wiring may need one. Ask your city or county building department.
Sources
- TCNA: Industry organizations and committees (TCNA Handbook)
- TCNA: ANSI A108-A118-A136.1 specifications (July 2026)
- TCNA FAQ: Deflection
- TCNA FAQ: Oriented strand board (OSB)
- TCNA FAQ: Concrete curing
- TCNA FAQ: Tile over other flooring
- OSHA: Respirable crystalline silica
- OSHA: Small Entity Compliance Guide for Respirable Crystalline Silica in Construction
- EPA: Learn about asbestos
- 40 CFR 745.83: Definitions for Subpart E (minor repair and maintenance activities)
Checked November 19, 2026. We read the TCNA FAQ pages and publication listings linked above, the OSHA silica page and the first part of OSHA's compliance guide, the EPA asbestos page and the text of 40 CFR 745.83. We did not read the TCNA Handbook or the ANSI A108 text themselves (they are sold publications), so tolerances for flatness and mortar coverage are not given here: take them from your tile and mortar makers' instructions and the Handbook method the installer cites.
Keep reading
-
Remodel
Subfloor and moisture checks
Stiff, flat, sound and dry: what to check under the floor before new flooring, and what to ask.
-
Remodel
Bathroom remodel
Refresh or gut, tile and waterproofing, the fan, permits, and what a bid has to say.
-
Remodel
Vinyl plank and laminate
Click-lock planks: how they differ, why flatness and the wall gap matter, and the warranty fine print.