Price level 90.8
Remodeling in Missouri: licensing is local, lien notices are not optional
Low regional price level, no general state contractor license that I could find, and a written lien notice you should receive before you pay.
By RenovaOak Editorial Team Updated 5 min read
- Price level
- 90.8 (U.S. = 100)
- Contractor license
- No general state license
- Contract rules
- Lien notice before pay
In short
Missouri's price level is 90.8, in the lowest tier. That figure is a household index and not a remodeling price. The state's list of licensing boards has no general contractor or remodeler board, so check with your city or county. State law requires an original contractor to give you a written Notice to Owner about liens before taking payment. There is no statewide residential code, and the federal EPA runs the lead-safe rule.
Missouri at a glance
Reading a price level of 90.8
BEA, the Bureau of Economic Analysis, compares what a typical household pays for its whole basket of goods and services in each state against a U.S. average of 100. Missouri comes in at 90.8 for 2024. Rent is part of that basket, which is why the number says little about carpenters, tile or cabinets. It is not a remodeling price.
Get your own numbers instead. Ask three local contractors for written bids and compare them in the bid comparison tool. The Bureau of Labor Statistics OEWS tables at data.bls.gov/oes show wages for carpenters, electricians and plumbers in your metro or region, which helps you judge how labor fits into a bid.
Who may do the work
The Missouri Division of Professional Registration lists its boards on its website. I read that list in November 2026 and found no board for general contractors, home builders or remodelers. Electrical contractors do have one, and a section of the state's statutes is titled "Political subdivisions to recognize statewide licensure" for them; I did not read its operative text. In practice, general remodeling oversight falls to cities and counties, and rules differ from one to the next.
So the first call is to your city or county building office. Ask whether the contractor must register or hold a local license, and whether the trades on your job (electrical, plumbing, mechanical) need separate credentials. Then ask the contractor for the document and check it with the issuer. The questions in choosing a remodeling contractor cover insurance and references.
Contract and payment rules
Missouri does not appear to have a home-improvement contract statute with a required written contract or a deposit cap; I checked the statutes I could open and the Attorney General's consumer pages, and did not find one. What the state does require is a lien notice. Under RSMo 429.012, an original contractor must give you written notice, in ten-point bold type, before receiving payment. It must be headed "NOTICE TO OWNER" and warns that if the contractor fails to pay suppliers or workers, a lien can follow, and that skipping lien waivers can mean paying twice. A contractor who leaves the notice out on purpose commits a class B misdemeanor.
| Paper | Source | What it does |
|---|---|---|
| Notice to Owner | RSMo 429.012 | Written lien warning from the original contractor before payment |
| Owner consent to liens | RSMo 429.013 | Needed, in separate ten-point bold type, before a subcontractor or supplier can file a lien on an owner-occupied home of four units or fewer |
| Right to cancel | Attorney General guidance | Three business days when the seller presented the contract in your home |
Ask for lien waivers as you pay, and be careful before you sign any separate consent form for liens. The change orders page explains how to keep price and scope changes in writing. The federal Cooling-Off Rule (16 CFR part 429) also covers sales made at your home or away from the seller's place of business.
Permits and code
Missouri has no statewide residential code. The ICC's state page says most building codes are adopted locally and that the state adopts codes only for state-owned buildings. A town may enforce a recent International Residential Code, an older one, or none at all, and unincorporated areas of a county may have no inspector. Ask the building office what it enforces, as of today, before you set a schedule.
Where a permit is required, the local office issues it. What typically needs one is covered in permits for interior remodels. I did not confirm any statewide rule about homeowners doing their own permitted work, so ask.
Lead-safe work in older homes
Missouri is not among the states EPA has authorized, so EPA runs the Renovation, Repair and Painting (RRP) rule here. A paid contractor who disturbs paint in a pre-1978 home must be EPA-certified and follow lead-safe practices. The rule leaves out jobs that disturb 6 square feet or less per room inside, or 20 square feet or less outside, except window replacement and demolition of painted surfaces. Read lead paint and asbestos in older homes before you plan demolition.
Where to check and complain
- Your city or county building office: local registration, licenses and permits.
- Missouri Attorney General: consumer complaints online at app.ago.mo.gov/app/consumercomplaint.
- Door-to-door sales: the Attorney General's page on door-to-door sales explains the three-business-day cancellation.
Common questions
Does Missouri license general contractors?
The state's professional registration list shows no board for general contractors or remodelers. Cities and counties set their own rules, so ask your local building office.
What is the Notice to Owner?
A written lien warning that an original contractor must give you before receiving payment under RSMo 429.012. Missing it is a class B misdemeanor if intentional.
Do I get three days to cancel a remodeling contract?
The Attorney General says three business days when the seller personally solicited you and presented the contract in your home. A job you started by calling the contractor to your office or asking for a bid may not qualify.
Which residential code applies to my remodel?
Whatever your city or county has adopted. Missouri has no statewide residential code, so ask the local building office.
Sources
- Missouri Division of Professional Registration: boards and professions
- Missouri Revisor of Statutes: RSMo 429.012
- Missouri Revisor of Statutes: RSMo 429.013
- Missouri Revisor of Statutes: Chapter 324
- Missouri Attorney General: door-to-door sales
- ICC: Missouri code adoptions
- EPA: Lead Renovation, Repair and Painting Program
- 40 CFR 745.83, definitions for renovation (Cornell LII)
- FRED: BEA regional price parity, Missouri (MORPPALL)
Checked November 19, 2026. Read: the Division of Professional Registration board list, RSMo 429.012 and 429.013, the heading of Chapter 324, the Attorney General's door-to-door sales page, the ICC adoption page, EPA's RRP page and 40 CFR 745.83. Not read: the Attorney General's main consumer page (it did not load), the operative text of the electrical contractors statute, and any city or county licensing ordinance. Price level: BEA release 26-10 (February 19, 2026); the next release is due December 10, 2026. A second check on November 20, 2026 read the main official pages again; it did not re-check the lien notice or the 3-day cancel right.
Keep reading
-
Planning guide
Choosing a contractor
Scam signs, license and insurance checks, comparable written bids, contract basics and what to do in a dispute.
-
Planning guide
Change orders and payment schedules
Put every change in writing, understand allowances and contingency, and pay in a way that protects you.
-
Planning guide
Lead paint and asbestos in older homes
EPA's lead-safe rule, EPA's asbestos advice, and the testing and contract lines to settle before you open a wall.