Lighting and electrical updates: swap, add or rewire

What separates a fixture swap from new wiring, how LED labels work, where permits and the model code come in, and what to ask an electrician.

By RenovaOak Editorial Team Updated 8 min read

What it covers
Fixtures, switches, wiring
Usual order
Wiring, drywall, paint
Biggest unknown
Wiring behind the wall
Permit
Often, for new wiring
Illustration: a wall cutaway showing a switch box, cable run through studs, a ceiling fixture box and a recessed light with labels
Every fixture hangs on a box, and every box sits on a cable you cannot see.

In short

Lighting and electrical work comes in three sizes: swapping a fixture or switch, adding fixtures or outlets on existing wiring, and new circuits or panel work. The first is a small job. The last two are where permits, inspections and a licensed electrician come in. The model code behind it is the National Electrical Code (NFPA 70), and your building department decides which edition applies. Opening walls to run cable also means drywall repair and paint afterward, so price the whole chain.

Three sizes of electrical work

Ask any bidder which of these three sizes the job is. The size sets the permit, the inspection, who may legally do it and the mess left behind.

  • Swap: a new fixture, switch, dimmer or outlet in the same spot on the same wire. The box and cable stay.
  • Add: a new fixture, recessed lights or an outlet fed from an existing circuit. This means cutting into the wall or ceiling, fishing cable and adding load to a circuit that already exists.
  • New circuit or panel work: a new run from the panel, a dedicated circuit for an appliance, or a larger panel. A service upgrade tied to a heat pump or solar is outside this site's scope; a rewire or new circuits inside a remodel are covered here.

The bid should say which of these it covers, how many fixtures, switches and outlets are in it, and who supplies each fixture. If you choose the fixtures, the bid usually carries a finish allowance, which is a set amount for them. Choose a pricier fixture than the allowance assumes and the difference comes back to you as an added charge. Ask what the allowance covers, and see change orders for how added items should be written.

Reading the label: lumens, watts and LEDs

The U.S. Department of Energy says residential LEDs, especially ENERGY STAR rated products, use at least 75 percent less energy than incandescent lighting and last up to 25 times longer. It also says incandescent bulbs release about 90 percent of their energy as heat. For the bulb you are buying, read the Lighting Facts label, which gives the brightness and the color.

Brightness is measured in lumens, not watts. Watts tell you how much power the bulb uses. To compare bulbs, use the lumens on the label, then look at the watts to see what it costs to run.

Worked example with made-up numbers: replace a 60-watt incandescent bulb with an LED that uses 15 watts and gives about the same light. The LED uses a quarter of the power, a 75 percent saving, which matches the minimum DOE gives. Use the watts printed on your own bulbs, and your own hours.

Worked example with made-up numbers: one bulb used 3 hours a day
StepMathResult
Watts saved60 − 1545 W
Watt-hours a year45 × 3 × 36549,275 Wh
Kilowatt-hours a year49,275 ÷ 1,00049.3 kWh
Ten bulbs like it49.3 × 10493 kWh

Multiply the kilowatt-hours by your own rate from your utility bill to see what it means for you. On dimmers, check the bulb package and the dimmer maker's compatibility list, since not every LED works on every dimmer. Color, such as warm or cool white, is on the label, and it is worth looking at a bulb in the room before you buy a whole set.

What is behind the wall

Wiring is hidden until someone opens the wall. The electrician looks at the existing box, the cable going into it and the breaker feeding it, and then decides how much can be added. In an older house, the original wiring may need a closer look before you add load to it. Ask the electrician to inspect the circuit and tell you what they found, in writing.

  • Finished walls and ceilings: running new cable through a finished wall often means cutting access holes in the drywall and patching them. Price that with drywall repair and texture and paint, because the electrician's bid usually does not include them.
  • Insulation and heat: a recessed fixture in an insulated ceiling needs to be a type that the label says may be used there. Ask the electrician to show you the label.
  • Old paint and textured ceilings: cutting holes in a painted surface disturbs paint, and cutting through a textured ceiling disturbs the texture. In a house built before 1978, the EPA's lead rule covers paid work that disturbs paint, and the EPA lists textured paint and patching compounds among materials that may contain asbestos. Test before cutting. See lead paint and asbestos in older homes.

The small-job exception in the lead rule covers 6 square feet or less of painted surface per room inside, and it allows none of the prohibited practices: open-flame burning, machines without a shroud or containment and a HEPA vacuum, or heat guns at or above 1,100 degrees Fahrenheit. A few small switch-box holes can fit under the exception. A new cable run through several walls may not, so ask the firm which rules it follows.

Code and permits

The National Electrical Code (NFPA 70) is a model code, a standard that states and cities adopt, often with their own changes. Which edition applies to your job is decided locally, so ask the building department for the edition and for any local amendments. Do not rely on an article you read online, including this one, for section numbers.

Some typical touchpoints, which differ by place:

  • Permits: adding circuits, adding recessed lights or moving boxes commonly needs an electrical permit and an inspection. A like-for-like fixture swap often does not. The building department decides.
  • Protective devices: the code requires ground-fault and arc-fault protection in certain locations of a dwelling. Which locations, and whether work on an existing circuit triggers the rule, depends on the adopted edition. Ask the electrician which devices the job needs, and ask the building department to confirm.
  • Inspection: a permit generally ends with an inspection of the work before the walls close. Schedule the drywall crew after it, not before. Details are in permits for interior remodels.

Contractor and electrician licensing is set by the state or the city, and it differs. Your state page under price by state gives the state-level rule. Many places let a homeowner do work on their own house under a permit, and many do not, so check before you buy a box of wire.

DIY or a licensed electrician

A homeowner who knows how to shut off a breaker and test that the wire is dead can swap a fixture or a switch. For that, turn off the breaker, test the wires with a tester before you touch them and never trust the wall switch to cut power. Replace like with like, and use a box that supports the weight of a ceiling fan if you are installing one.

Everything beyond the swap is electrician work: new circuits, anything at the panel, recessed lights in a finished ceiling, wiring you cannot identify, aluminum or very old wiring, and any outlet that warms up or sparks. A wiring mistake can stay hidden inside a wall for years, and a fault there can start a fire, which is why many places license electricians.

What drives the price and what to ask

Access

Open walls and attics are quick. Finished walls and ceilings take fishing, holes and patching.

Count and type

Each new box, fixture and switch takes labor. Recessed lights and dimmers add steps.

Circuit capacity

A full panel or a shared circuit can mean a new run or a larger panel.

Fixtures

The fixture you pick, and who buys it, drives the material side of the bid.

  1. Ask for the license number, the permit plan and who pulls the permit. Check the license with your state or city.
  2. Ask for a line-by-line list: fixtures, switches, outlets, circuits, and who buys each fixture and its allowance.
  3. Ask what the electrician found in the existing wiring and what the bid assumes about it.
  4. Ask who patches and paints the access holes, and in what order the trades work.
  5. Ask which protective devices (ground-fault and arc-fault) the job uses and why.
  6. Ask about the inspection schedule, and keep the permit paperwork. Compare bids with the quote check tool.
  • Common mistakes: picking fixtures after the walls are closed, adding circuits without a permit, buying bulbs by watts rather than lumens, hiring without checking the license, and leaving no budget for drywall and paint.
  • Order of work: rough wiring comes before drywall, and fixtures and trim-outs come after paint. This is a trade convention. See the remodel order of work.

For related decisions, see the paint order tool for the walls you open, the resale math tool for your own numbers, the floor and tile order tool for boxes and waste, and the basement bedroom check for ceiling height and egress when you light a lower level.

Common questions

Can I replace a light fixture myself?

A like-for-like swap is a common do-it-yourself job when you turn off the breaker and test that the wires are dead. Anything that involves a new circuit, a panel or a ceiling you cannot reach should go to a licensed electrician. Check your local rules on owner work.

Do I need a permit to add recessed lights?

Often yes, because it means new cable runs and cutting into the ceiling. Your building department decides, and the inspection happens before the ceiling is closed. Ask before you buy the fixtures.

Should I buy bulbs by watts or lumens?

By lumens. Lumens measure brightness and watts measure the power used. The Lighting Facts label gives the brightness and the color. The DOE says residential LEDs use at least 75 percent less energy than incandescent bulbs.

Which edition of the National Electrical Code applies to my house?

The edition your state or city has adopted, with any local changes. NFPA 70 is the model code, and adoption is local. Ask your building department.

Sources

Checked November 19, 2026. Read: the DOE LED page, the NFPA 70 information page, the EPA RRP and asbestos pages and 40 CFR 745.82, 745.83 and 745.85. Not read: the text of the NEC or the International Residential Code, which could not be opened for this review, so this page gives no section numbers, no list of protected locations and no code edition. It gives no prices on purpose. Your building department and a licensed electrician have the current local rules.